Multi-Link SR-3 Instrukcje Operacyjne Strona 20

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 27
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 19
Multiple Line
Installation
A.
Before
a Key System
Ring
Supervision:
Excellent
Barge-in
Protection:
Excellent
Install,
Ease/Expense
Good
TO KEY PHONES
You
can only
install
your SR
on
the CO* side of the KSU.
You
cannot
install
it
on
the station or extension
side.
1) Disconnect the desired line from the KSU.
2) Mount the SR
in
a convenient location near the KSU. Under two of the
feet
on
the SR are mounting slots.
3) At the
demarc,
install
an
RJ-11 if one
does
not exist.
Label
it “LINE”.
Attach the “LINEjack of the SR to this RJ-11 with the supplied line
cord.
Shorten if desired.
*
Telephone company
18
SR
Serles
Przeglądanie stron 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27

Komentarze do niniejszej Instrukcji

Brak uwag